Construction measures of Foshan steel structure during rainy season

Time:[2017-9-27]  Hits:4906

First, Foshan steel structure project rainproof measures
Arrange special people to know the weather forecast in time and master the weather data in advance. Arrange the inspection management of special site in rain, do not comply with the rainproof measures or measures non-standard place, must subcontract deadline ordered rectification, especially for lightning protection measures must be carefully check all.
Two, Foshan steel formwork rainproof measures
When the formwork is stacked, the lower layer must be ground with the ground to prevent the rain from soaking and damaging. At the template stacking site, effective ground drainage measures must be taken to prevent rainwater from depositing.
Three. Rainproof measures for reinforcing bars
L for the site to place a longer time to prevent rain reinforcement steel cover, prevent serious corrosion of reinforcement. The steel stacking site must have good drainage to prevent rainwater from depositing and soaking the corroded reinforcement.
2 Foshan steel structure rainproof measures
To ensure the normal construction period, ensure the quality of the project. The main process of the project and the climate sensitive process, should be based on the characteristics of the rainy season construction, the preparation of the corresponding measures.
High strength bolts shall not be installed on rainy days, and no rain water shall be allowed on friction surfaces and high-strength bolts. During rainy weather, can not meet the requirement of production and can not guarantee the safety of construction, should stop construction. At this point, attention should be paid to ensure the safety of the work surface, set up the necessary temporary reinforcement measures. Steel structure hoisting must hang net in the outside of the building facade, building stairs, building adjacent edges and can not cover the holes to set up protective railing. For the components to be lifted, the water on the surface of the component shall be cleaned first, especially the friction surface of the component, and the surface layer shall be dried
3 、 welding of Foshan steel structure
Before the construction, should be in the operating platform than at the height of 1m welding with flame retardant woven cloth is tightly wrapped around the pillar, and the platform plane caves with asbestos clothgai Yan, so that the wind and the welding slag splashing down. In principle, outdoor welding is not performed on rainy days. Welding machine, welding wire, the cylinders should be placed in a special shed. So as not to damp the welding material.
4. Installation of high strength bolts for steel structure in Foshan
The use of high-strength bolt, high strength bolt with visual inspection, there shall be no rust, damage thread phenomenon, such as repair after use. Keep the connection clean and dry.
5, Foshan steel structure scaffolding rainproof measures
Rain, rain must be checked one by one to the scaffold fastener, and must check the scaffolding foundation is firmly in the inspection process. In the inspection process, construction and inspection personnel must ensure their own safety, protective measures in place, pay attention to anti-skid, fall prevention, is strictly prohibited command.
6, Foshan steel structure rain proof measures
All kinds of electrical leakage protection device must be sensitive, all kinds of construction line check, insulation outsourcing must be in good condition without damage, prevent leakage of rainwater electric wounding; outdoor setting electric welding machine, grinding machine, threading machine and other equipment should be set up under the upper canopy, take the method of preventing the rain soaked pad. Power line is not erected, bare or plastic wire, distribution box must rain. Metal mechanical and electrical equipment must adopt zero reliable protection, leakage protection device for motor switch box should be reliable. Any mechanical operator must be certified and wear insulated rubber gloves and insulated gloves as required. In case of heavy rain to stop all electrical and mechanical operations, the electric field of steel processing field must turn off the power, after the rain should timely check the organization safety performance of machinery, electrical appliances, rain weather prohibited lifting equipment and components and manual handling of materials or equipment etc.. The cable wires and wires used in the field are strictly forbidden to be soaked in rainwater or laid on wet ground. Overhead installation or underground installation and safe and reliable protection measures should be installed. Before the construction of the rainy season, the power supply, electric box, tower crane grounding, insulation and other projects shall be measured and recorded. After the rain, all electrical equipment and electrical boxes should be checked once. The doors of each electric box must be closed and must not be opened.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
狠狠操综合网_欧美色婷婷久久99精品红桃_91成人精品视频_日韩欧美精品一区二区
99免费精品在线| 在线视频欧美精品| 亚洲一线二线三线视频| 欧美成人欧美edvon| 久久另类ts人妖一区二区| 欧美成人蜜桃| 久久99精品国产麻豆婷婷 | 国产a级毛片一区| 亚洲第一精品在线| 国产精品视频线看| 日韩欧美一级片| 91高清在线观看| 国产伦精品一区二区三区照片91| 欧美一区2区三区4区公司二百| 日本在线观看不卡视频| 国产精品久久久久久久久免费樱桃 | 色综合天天综合给合国产| 卡一卡二国产精品 | 免费在线观看成人av| 99re这里只有精品6| 精品一区二区影视| 亚洲bt欧美bt精品777| 中文字幕在线不卡| 久久久久久免费毛片精品| 91麻豆精品久久久久蜜臀| 久久亚洲色图| 日韩午夜精品| 国产精品二区二区三区| 成人av片在线观看| 国产综合久久久久久鬼色| 日韩中文字幕不卡| 亚洲综合在线电影| 国产精品欧美一区二区三区| 91麻豆精品国产91久久久资源速度 | 欧美日韩精品一区视频| 美日韩在线观看| 国产欧美韩日| 亚洲国产精品第一区二区| 欧美日本三区| 99久久精品一区| 成人永久免费视频| 国产aⅴ综合色| 国产美女在线精品| 精品一区二区三区蜜桃| 婷婷国产v国产偷v亚洲高清| 亚洲一区在线播放| 亚洲精品中文在线| 国产精品传媒在线| 亚洲国产精品成人综合| 国产亚洲成av人在线观看导航| 精品日韩av一区二区| 91精品国产高清一区二区三区 | 欧美一区二区三区在线看| 欧美日韩一级片在线观看| 久久婷婷麻豆| 久久九九精品| 久久精品日韩欧美| 午夜精品福利久久久| 亚洲第一会所有码转帖| 亚洲午夜久久久久久久久电影院| 夜夜嗨av一区二区三区中文字幕| 亚洲黄色av一区| 亚洲精品国产一区二区三区四区在线 | 日韩国产一区二| 日韩专区在线视频| 日韩国产在线观看一区| 日韩成人午夜精品| 精品一区二区三区欧美| 狠狠色综合日日| 国产曰批免费观看久久久| 国产乱码字幕精品高清av| 国产成人久久精品77777最新版本| 国产黄色91视频| 成人h动漫精品一区二| 97精品超碰一区二区三区| 久久久天堂av| 中文字幕成人网| 亚洲天堂2014| 一区二区三区视频在线看| 性感美女极品91精品| 日韩电影在线免费| 精品一区二区免费视频| 国产福利91精品一区二区三区| 欧美国产激情一区二区三区蜜月| 国产精品人成在线观看免费| 亚洲人成精品久久久久| 一区二区三区免费网站| 亚洲国产一区二区三区| 日日夜夜免费精品| 九色综合国产一区二区三区| 国产精品1024| 色综合一个色综合亚洲| 亚洲视频在线二区| 一区二区三区福利| 日本精品免费观看高清观看| 欧美喷潮久久久xxxxx| 日韩欧美区一区二| 中文在线一区二区| 亚洲精品日日夜夜| 婷婷开心久久网| 国产精品资源站在线| 99re8在线精品视频免费播放| 亚洲手机在线| 久久美女性网| 日韩午夜在线播放| 日本一区二区三区视频视频| 亚洲免费成人av| 日本91福利区| 激情另类小说区图片区视频区| 成人一级黄色片| 国产一区二区三区四区三区四| 国产亚洲毛片| 欧美色视频在线| 久久伊人蜜桃av一区二区| 中文字幕在线一区| 午夜精彩视频在线观看不卡| 国产呦萝稀缺另类资源| 欧美激情性爽国产精品17p| 国产精品一区免费观看| 欧美日韩中文另类| 久久久九九九九| 亚洲无线码一区二区三区| 黄色精品一二区| 欧美黄色免费| 欧美一级视频| 69精品人人人人| 日本一区二区视频在线观看| 亚洲成人av一区二区| 国产精品一区一区三区| 国语精品中文字幕| 欧美午夜精品理论片a级按摩| 精品日韩在线观看| 一区二区三区四区蜜桃 | 日韩一区二区三区免费看 | 亚洲在线观看免费| 国产真实乱偷精品视频免| 欧美精品一区在线| 色欲综合视频天天天| 337p粉嫩大胆色噜噜噜噜亚洲| 日韩理论片在线| 久久精品国产亚洲一区二区三区| hitomi一区二区三区精品| 亚洲一区bb| 精品欧美一区二区在线观看| 一区二区中文视频| 国内精品国产三级国产a久久| 国内精品国语自产拍在线观看| 色美美综合视频| 国产婷婷色一区二区三区| 丝袜亚洲精品中文字幕一区| 99国产一区二区三精品乱码| 性色一区二区三区| 精品动漫一区二区三区在线观看| 一区二区免费视频| 成人手机电影网| 亚洲欧美成人| 久久亚洲精精品中文字幕早川悠里 | 国内成+人亚洲+欧美+综合在线| 国内自拍一区| 欧美高清精品3d| 亚洲精品国产精品乱码不99| 国产成人av一区二区三区在线| 亚洲精品一区二| 91精品国产一区二区| 亚洲最色的网站| 99精品国产一区二区三区不卡| 91福利区一区二区三区| 国产精品国产三级国产aⅴ原创| 精品一区二区影视| 亚洲清纯自拍| 日韩三级高清在线| 无吗不卡中文字幕| 91美女视频网站| 精品视频全国免费看| 亚洲视频在线一区二区| 国产精品69毛片高清亚洲| 国产情侣一区| 久久精品夜色噜噜亚洲a∨| 久久99久久99小草精品免视看| 在线观看一区视频| 日韩精品一区二区三区四区| 亚洲福利国产精品| 欧美日韩蜜桃| 日韩精品一区二区三区视频 | 久久看片网站| 国产精品乱码人人做人人爱| 国产一区二区伦理片| 亚洲综合三区| 国产精品视频九色porn| 成人免费小视频| 成人app软件下载大全免费| 在线看国产一区二区| 国产精品美女视频| 国产a级毛片一区| 91福利国产精品| 一区二区三区在线不卡| 91麻豆免费视频| 欧美日韩一区二区欧美激情| 一区二区在线观看免费视频播放| 99国产精品国产精品毛片|