Discussion: construction quality fireproof paint

Time:[2014-12-10]  Hits:5913

Discussion: construction quality fireproof paint

Construction Notes (a) fireproof paint

1, the substrate surface cleaning fireproof paint should serve as a rigorous inspection process. Remove dust, iron, rust, grease, and other substances hinder adhesion and good anti-rust treatment of the substrate. Fireproof coatings and surface coating layer should be a corresponding support, not rust primer steel.

2, fireproof paint spray paint to master consistency, mouth spray distance and grab components and injection pressure when the air compressor. MAIN OUTCOME construction, construction parameters described splashed thing more unreasonable and should be adjusted. Content is not too much paint thinner, otherwise it will reduce the viscosity of the normal construction paint, paint can not be attached to the steel surface.

   3, fireproof spray protection by trained and professionally qualified construction team construction corresponding construction quality. Strict construction program based on engineering and other features and product selection. Physical and chemical properties of the coating in accordance with engineering works required before the required proportion for sampling. Intumescent fire retardant coating for construction should be selected in different parts of the test foaming properties.

4, after the completion of the project can not only measure the thickness of the coating should also be visually detected by coating color coating and crack and leak case, with 0.75 ~ 1kg hammer to tap the coating detected intensity, etc., with 1m ruler detection coating flatness. Coating should be smooth, no significant depression, firmly bonded, no powder, loose and floating pulp, mastoid has been removed, seamless coating, from powder, obvious cracks.

5, in the coating application process, you must forward again after drying and curing the coating base, again after re-construction. Protection coatings, construction passes and the protective layer thickness should be determined in accordance with the requirements of the construction design, each pass coating thickness should be moderate, not too thick or roll evenly, so as not to affect the quality of the coating. Conducted in strict accordance with the coating process, in order to avoid rush period and to building a security risk.

6, the coating thickness should meet the design value, it should be made thicker parts processing node. Spraying site requirements, component surface treatment, filling seams, paint preparation, spraying passes, such as quality control and inspection, shall comply with existing national "fireproof coatings technical specifications" (CECS24) the required standards. The coating thickness should side edge construction inspection (measured by thickness). If the crack width coating widespread and large, research and analysis process should be correct, paint mixing ratio is reasonable.

(B) construction quality fireproof coatings main problem

Fire-resistant coating is formed by coating application engineering staff at the surface of steel components, to complete the whole process of fireproof coatings. Construction is fireproof paint fireproof paint secondary production process, if improper construction can also affect the quality of fireproof coatings project. Construction of the main problems,

1, ignoring the substrate surface cleaning, fire retardant coatings affect performance.

2, the construction team does not have the appropriate construction quality, technical strength is not weak.

3, before construction is no scientific construction plan, the construction process can not be strictly in accordance with the technical standards of construction quality inspection.

4, the completion and acceptance of fire-resistant coating is only rely on visual inspection and coating thickness testing, lack of strict acceptance criteria and testing methods.

5, the pursuit of appearance and finish, polished coating or fire retardant paint coating outside brushing ordinary decorative coatings, resulting in the technical performance of the coating is not guaranteed.

(C) acceptance fireproof coatings

1, fireproof coatings inspection report should provide the following:

(1) the amount of purchase orders fireproof paint;

(2) fire retardant paint coating side edge construction inspection records;

(3) inspection and acceptance test items hidden project records;

(4) the completion of the report after the completion of the single and self-test report;

(5) the construction site inspection records and quality control during the construction of major issues deal with submissions;

The fire resistance test report (6) fire retardant coating national testing agencies and physical and chemical properties of the test report, fire department issued a production license supervision and production of the factory product certification.

2, fireproof coatings project must go through mediation before acceptance testing professional organizations

Fireproof coatings should also be included in the "building fire testing procedures", "building fire acceptance criteria" such as technical standards, all painted interior, front outer fireproof coatings construction completion and acceptance testing organizations must have an intermediary steel structure fire retardant coating detection qualified report.

Fireproof paint testing and acceptance is based mainly: GB14907-2002 "fireproof paint general technical conditions", GB50205-2002 "steel construction quality and acceptance", CECS24 "fireproof coatings application of technical specifications." Fireproof paint the fire resistance measurement method should determine the type of environment and under fire, such as by: petrochemical enterprises use fireproof coatings, its fire resistance test temperature curve should be measured hydrocarbon fire, it is more realistic .

Construction strengthen surveillance, observation and attention to the appearance of quality coating thickness checks and other construction quality inspection and found the problem immediately rectification; checks must pass rigorous testing after completion. In addition, research and technology development fireproof coatings are also expected to improve fire safety in a variety of physical and chemical properties and to seek a breakthrough performance, while supporting research fireproof coatings and coating durability of construction equipment, improve the level of construction technology, a clear coating updating and maintenance methods and cycles. So as to better improve the overall fire resistance fireproof coatings. After brushing fire retardant coating on steel, greatly improving the fire resistance of steel, but in fireproof coatings applications, there are improper coating selection, poor construction management, final acceptance, testing is not standardized, and many other issues seriously affect the quality fireproof coatings. Must pay attention to a reasonable selection of pre-construction products, determine the correct construction program.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
狠狠操综合网_欧美色婷婷久久99精品红桃_91成人精品视频_日韩欧美精品一区二区
日韩一区二区在线免费观看| 久久 天天综合| 国产一区二区三区黄| 成人黄色大片在线观看| 偷拍一区二区三区四区| 日本一区二区三级电影在线观看| 色偷偷久久一区二区三区| 欧美一区免费视频| 美洲天堂一区二卡三卡四卡视频| 欧美韩国日本综合| 7777精品伊人久久久大香线蕉经典版下载 | 亚洲精品视频免费观看| 日韩一区二区免费在线电影| 国产嫩草一区二区三区在线观看| 91碰在线视频| 国产成人综合自拍| 日本aⅴ免费视频一区二区三区| 国产精品网站在线播放| 日韩精品最新网址| 久久亚洲图片| 亚洲国产一区二区三区a毛片| 懂色av一区二区在线播放| 男女视频一区二区| 亚洲一区二区视频在线观看| 中文欧美字幕免费| 精品日韩一区二区三区| 欧美日韩一区二区在线视频| 国产精品日本| 国产一区亚洲| 91欧美一区二区| 国产高清视频一区| 日本欧美在线观看| 夜夜亚洲天天久久| 国产精品午夜电影| 欧美成人免费网站| 欧美美女激情18p| 久久婷婷麻豆| 国产一级久久| 亚洲精品系列| 欧美日韩一区二| 成人激情校园春色| 国产伦理精品不卡| 久久av老司机精品网站导航| 国产欧美日韩三区| 精品成人佐山爱一区二区| 欧美喷潮久久久xxxxx| 老司机亚洲精品| 久久久7777| 久久国产日本精品| 国产日韩三区| 国产伦精品一区二区| 日韩亚洲不卡在线| 136国产福利精品导航网址| 国产精品v欧美精品∨日韩| 欧美日韩国产综合网| k8久久久一区二区三区| 成人精品gif动图一区| 国产福利一区二区三区视频 | 欧美这里有精品| 色天天综合久久久久综合片| 快she精品国产999| 久久久久一区二区| 每日更新成人在线视频| 国产欧美韩日| 国产日韩欧美在线播放不卡| 一区二区三区欧美成人| 99精品国产福利在线观看免费| 国产精品国产三级国产专区53| 欧美日韩三区四区| 欧美日一区二区在线观看 | 国产精品不卡一区| 中文字幕一区免费在线观看| 18成人在线观看| 亚洲欧美激情小说另类| 亚洲激情图片小说视频| 亚洲自拍偷拍图区| 亚洲mv在线观看| 青青草原综合久久大伊人精品| 免费在线视频一区| 久久精品久久久精品美女| 国内精品伊人久久久久av一坑| 国产一区二区久久| 高清国产一区二区| av激情综合网| 国内精品国语自产拍在线观看| 狠狠色噜噜狠狠色综合久| 影音先锋亚洲精品| 亚洲在线观看| 欧美性受xxxx黑人xyx| 7777精品伊人久久久大香线蕉超级流畅| 欧美一区二区三区日韩视频| 欧美成人欧美edvon| 国产亚洲自拍一区| 亚洲国产成人在线| 亚洲免费伊人电影| 亚洲电影激情视频网站| 日本午夜一区二区| 国产真实乱子伦精品视频| 成人h精品动漫一区二区三区| 91片黄在线观看| 在线精品亚洲| 久久精品国语| 欧美精品日韩综合在线| 精品免费国产二区三区 | 欧美69视频| 亚洲精品一区二区三| 久久国产66| 欧美日韩国产欧美日美国产精品| 欧美一二三区在线观看| 久久精品亚洲乱码伦伦中文| 亚洲男同性视频| 奇米一区二区三区| 国产91在线观看丝袜| 欧美特黄a级高清免费大片a级| 国产亚洲二区| 欧美日韩国产综合久久 | 欧美99久久| 亚洲专区一区| 91精品国产欧美日韩| 国产精品视频观看| 五月婷婷激情综合| 国产成人高清视频| 亚洲天堂久久| 一本到不卡免费一区二区| 日韩欧美黄色影院| 国产欧美一区二区精品忘忧草| 亚洲欧美另类小说视频| 麻豆极品一区二区三区| 成人动漫一区二区| 一区二区三区国产盗摄| 欧美日韩成人综合在线一区二区| 欧美精品一区二区精品网| 国产精品国产三级国产aⅴ无密码 国产精品国产三级国产aⅴ原创 | 欧美精品一区二区三区四区| 亚洲黄色av一区| 久久97超碰国产精品超碰| 99久久精品情趣| 亚洲国产一区二区三区a毛片| 精品视频一区 二区 三区| 久久久精品综合| 午夜精品123| 国产成人精品影视| 伊人久久亚洲美女图片| 色婷婷久久久久swag精品 | 91在线丨porny丨国产| 国产精品视区| 精品欧美久久久| 亚洲国产精品尤物yw在线观看| 国内精品国产成人| 狠狠爱成人网| 欧美日韩在线亚洲一区蜜芽| 日本一区二区动态图| 精一区二区三区| 色综合天天综合给合国产| 久久久久久色| 欧美经典一区二区| 热久久免费视频| 欧美一区网站| 欧美色综合影院| 中文字幕一区二区三区在线播放| 美日韩一区二区三区| 欧美日韩精品免费观看| 色美美综合视频| 国产精品久久久久久亚洲毛片| 精品一区二区在线看| 国产一区在线免费观看| 7777精品久久久大香线蕉| 1000精品久久久久久久久| 国产在线视频一区二区三区| 亚洲国产清纯| 欧美大片免费久久精品三p| 午夜一区二区三区在线观看| 不卡的av电影在线观看| 日本黄色一区二区| 国产精品午夜电影| 欧美性生交片4| 亚洲女女做受ⅹxx高潮| 不卡电影免费在线播放一区| 色婷婷久久久久swag精品| 亚洲欧美综合另类在线卡通| 久久99日本精品| 亚洲免费不卡| 欧美大尺度电影在线| 亚洲h动漫在线| 欧美婷婷在线| 日韩三级电影网址| 亚洲成va人在线观看| 欧美婷婷久久| 欧美va亚洲va国产综合| 日本亚洲三级在线| 一区二区三区四区高清精品免费观看| 国产精品99久久久久久久vr| 美女视频一区免费观看| 亚洲国产精品av| 成人爽a毛片一区二区免费| 日本韩国精品在线| 亚洲免费观看视频| 91影院在线免费观看| 欧美熟乱第一页| 亚洲成a人在线观看|